Pre-production prep of advanced manufacturing tools for 777X

UPDATE: 777X: Composite Wing Center Builds up and fills out

In less than a year after its grand opening, the 777X Composite Wing Center in Everett, Wash., seems to take on a new look nearly every day, according to mechanics and engineers.

Construction on the 1.3 million-square-foot (121,000-square-meter) building continues, as it will for the next 18 months, with the roll-in of new tools and equipment. Preproduction parts for the 777X airplane are underway. Nearly 130 mechanics are testing equipment and the first prototype parts, while another 170 employees have moved into the offices so far.

“It’s pretty incredible,” said Brett Miller, a 777X tool engineer, noting that real tools and equipment that previously existed only on computer screens and design reviews are coming together.

The building will support fabrication of the 777X wing, the longest wing Boeing has ever built, and turn the Everett site into a center for advanced carbon-fiber technology.

The most important thing the program is doing is maintaining a schedule, said Norine Murray, a senior manager in Spar Fabrication.

“We’ve made a commitment to our customers,” she said. “Now, for the most part, we have maintained that schedule at the same time while we are meeting safety and quality commitments for the program.”

Production of the first 777X is expected to begin in 2017. Following flight testing and certification programs, the first delivery is scheduled for 2020. The aircraft’s GE9X turbofan engines also recently passed two testing milestones in preparation for their delivery to Boeing.

The company has invested more than $1 billion to construct the new facility. In grand opening ceremonies for the building in May, Boeing and community leaders said the company’s sizable capital investments in the 777X, along with other Boeing programs and capabilities based in the region, will provide continued jobs and benefits for years to come.

Fast Facts:

  • The 777X-9 seats 400-425 passengers with a range of 7,600 nautical miles
  • Production of the 777X is scheduled to begin in 2017; first delivery is targeted for 2020
  • The 777X will be the largest and most-efficient twin-engine jet in the world
  • 777X composite wing tips can fold up, offering greater airport gate compatibility

More in Marketplace

More than 100 Boeing employees joined 6,000 attendees from around the world at the 2018 Out & Equal Workplace Summit in Seattle, where Boeing was the event’s first-ever Host City Sponsor.
BoeingPride on full display at Out Equal Summit

Company plays host to more than 6,000 workplace advocates in Seattle, WA

Boeing reaches out to help military members and their families

Growing up on a military base can have its share of challenges… Continue reading

A $1-million grant from Boeing to The Nature Conservancy will help restore Northwest forests burned during wildfires and support tree planting in urban areas in Washington.
                                A $1-million grant from Boeing to The Nature Conservancy will help restore Northwest forests burned during wildfires and support tree planting in urban areas in Washington.
Boeing announces nearly $250 million in corporate giving

Includes $55 million in new grants to charitable partners and their programs in 2019 and beyond

First BOEING 777X flight test airplane comes together

Boeing’s longest passenger jet to fly in 2019

Local Students Engineering Smart Solutions for Boeing

Collaborative robotics, haptic alert systems for hearing-impaired employees and riveting safety —… Continue reading

Everybody wins in Boeing’s energy-reduction battle

There is nothing like a little friendly competition to show how when… Continue reading

Boeing inspires the next generation of engineers and technologists

Thousands of young students benefit from company volunteers’ teaching in STEM subjects

Boeing’s 737 MAX 7 takes center stage in 2018

Aircraft to be produced at Boeing’s Renton factory on the shores of Lake Washington

Domestic violence IS preventable: July 21’s Refuse To Abuse 5k is a unique run/walk through every level of Safeco Field, from the players’ tunnel to the final lap around the field.
LifeWire provides a lifeline for woman fleeing abuse

Refuse to Abuse 5K at Safeco Field raises funds and awareness to fight domestic violence

Real people. Real stories. The real impact of tobacco

Education campaign returns with powerful stories to help Island County residents quit smoking

Join the July 21 Refuse To Abuse 5k, a joint event from the Seattle Mariners and the Washington State Coalition Against Domestic Violence.
Survivor shares message of strength: Domestic violence is preventable

Lace up for the Refuse to Abuse 5k, July 21 at Safeco Stadium